Below are illustrations of the paving methods:
- This self-adhesive floor is suitable for cement grounds or surfaces of ceramic tiles, terrazzo, or wooden boards.
- Before the tiled floors, I suggest you clean the ground up, to make sure the ground is even, dry, and free of sand.
- To make them stable, please pile the floors up and keep them still under constant temperature for over 24 hours.
- We strongly suggest that the indoor temperature is kept between 10 Centigrade to 28 Centigrade (50 to 82.4 Fahrenheit).
Let start with the normal H-way flooring:
- Get a floor, cut it up in the middle, and secure one of the pieces in the corner of the room.
- Get a piece of uncut floor, justify the shorter end with the floor you paved before, and secure it. Pave the whole upper line in this way.
- Before you tail out the upper line, you have to measure the space, and then cut a floor accordingly.
- The next line starts with a whole piece. Pave them in the same way; the third line starts with a half piece. Pave the rest of the ground in exactly the same way.
- In order to make the pavement better, we suggest you install a skirting floor in the first place.
- If the skirting floor was installed before the pavement, we suggest you seal the seams with glass glue.
These floors are both waterproof and damp-proof, and for the sake of safety, they are flame retardant.